This PSC Annual report covers the period between 1st January and 31st December 2017. During this period the BS MOU member Authorities conducted a total of 5,112 inspections, representing 0.9 per cent increase as compared with 5,066 initial inspections in 2016. The regional inspection rate is 71.1% which is 1.3 per cent increase as compared with 2016. A total of 283 detentions were warranted to ships found with serious deficiencies. This represents a detention percentage of 5.54% which is 23.58 per cent increase as compared with 229 detentions in 2016.