Skip links
Adsız tasarım (2)

Ship Implementation Plan for the consistent implementation of the 0.50% sulphur limit under Marpol Annex VI

sulphur content of fuel oil requirement and adopted resolution MEPC.280(70) on the Effective date of implementation of the fuel oil standard in regulation 14.1.3 of MARPOL Annex VI1.

In this context, MEPC 73 agreed that Administrations should encourage ships flying their flag to develop implementation plans, outlining how the ship may prepare in order to comply with the required sulphur content limit of 0.50% by 1 January 2020. The plan could be complemented with a record of actions taken by the ship in order to be compliant by the applicable date.

Regulation 18.2.3 of MARPOL Annex VI requires a Party to take into account all relevant circumstances and the evidence presented to determine the action to take, including not taking control measures. Administrations and port State control authorities may take into account the implementation plan when verifying compliance with the 0.50% sulphur limit requirement.

A ship implementation plan is not a mandatory requirement. A lack of a ship implementation plan or an incomplete ship implementation plan should not be considered as “clear grounds” for a more detailed inspection.